Reno Stead: Concrete Floor Control Joint Sealing
Project Details
Cleaning and sealing the unfinished control joints of the concrete floor, Teklus Construction supports a commercial client to maintain the safety of the operation. We use a UV resistant, semi-rigid, and rapid curing polyurea joint filler that enables a fast turnaround and minimize an impact to the client’s operation. The project cleans and seals 44,500 feet of the control joints in 235,500 sf of the production area.
Market
Light-industrial facility maintenance
Location
North Reno, Nevada
Size
44,500 feet of control joins in 235,500 sf of production area
Services
Clean & seal concrete control joints
Status
Phase 1 completed
Phase 2 completed